Site
Brussels – Sint-Katherina-Lombeek
Year
2018
Client
Infrabel
Project Description
Local elevation of the contact wire height on both tracks of the L50C. The existing mobile arms at the Péde viaduct both need to be raised.
The re-electrification of the L50A between Brussels (KP5.250) and the Sint-Katherina-Lombeek branch line (KP15.900).
The R3 overhead lines need to be installed and finished as arranged.